118 panels for this vacuum forming factory in High Wycombe

23 January 2024 • 1 min read

With heavy machinery running for many hours of the day Interform Manufacturing’s electricity usage is extremely high, they approached Solarbility early last year to see how they could take control of their energy usage and bring the bills way down.

With a large trapezium metal roof we were able to maximise the amount of panels and create an impressive system size of 52kWp.

Interform Manufacturing Solar System

Planning is key to the smooth running and success of a project and here at Solarbilty we pride ourselves on being meticulous in our organisation and implementation of our systems.

The whole installation took less than a week with minimum disruption and no downtime for the customer. Off the back of this project we have another 2 buildings ready to be installed.

Get In Touch

Recent Posts

Vehicle-to-Grid: Why It Matters and Why We’re Not There Yet

Vehicle-to-Grid: Why It Matters and Why We’re Not There Yet

18 September 2026 • 4 min read
Why Does My Solar System Turn Off During a Power Cut?

Why Does My Solar System Turn Off During a Power Cut?

1 July 2026 • 3 min read
Why Solar Power Is a Smart Move in an Uncertain Energy World

Why Solar Power Is a Smart Move in an Uncertain Energy World

12 March 2026 • 3 min read
FoxEss technical